IT Services and Projects

Office Moves and Network Buildouts in Ventura County

An office move succeeds when staff arrive on Monday and everything works: internet, Wi-Fi, printers, phones and shared files. Urban IT plans the technology side of a move or new office build so those pieces are ready before the boxes arrive.

Our Westlake Village team coordinates with your landlord, internet provider, cabling contractor and phone vendor so you have one point of contact for IT.

  • One IT contact for the whole move
  • Network designed for the new space
  • Supporting local businesses since 2002

Where we work

Based in Westlake Village

Thousand Oaks  |  Westlake Village  |  Calabasas  |  Woodland Hills  |  Los Angeles  |  Beverly Hills

What we cover

  • Internet and network planning
  • Wi-Fi, switches and firewall setup
  • Workstation, printer and phone relocation

The short answer

What Does IT Involve in an Office Move?

IT for an office move covers everything that connects staff to their work: the internet circuit, the firewall and switches, Wi-Fi, cabling, phones, printers and computers. It also includes the timing, because internet service often takes weeks to schedule and should be ordered early.

A network buildout is the same work for a new or remodeled space. Urban IT designs the network, coordinates the vendors and sets up and tests the equipment. Hardware, cabling and carrier services are quoted separately from our labor.

Who it is for
Offices moving, expanding or opening a new location

What it costs
Projects are quoted, and hardware and cabling are quoted separately.

Where we work
On site across Ventura County and Los Angeles

How to start
A free IT assessment, ideally well before your move date

What goes wrong

Where Office Moves Run Into Trouble

Most problems trace back to late planning.

Internet ordered too late

The carrier cannot install before move day, and staff work without a connection.

Weak Wi-Fi in the new space

Coverage was never planned, so some rooms have poor signal.

Phones and printers forgotten

They are packed with the furniture and nobody remembers how they were set up.

Downtime on the first day

Equipment arrives untested, and troubleshooting begins with clients waiting.

What is included

What Our Office Move and Buildout Work Includes

The scope is set for your office.

Planning and timeline

We list what must be ready, order dates and who is responsible for each item.

Network design

We lay out the firewall, switches and Wi-Fi coverage for the new floor plan.

Vendor coordination

We work with your carrier, cabling contractor and phone provider.

Workstation and printer setup

Computers, printers and other devices are moved, reconnected and tested.

Phone and internet cutover

Service is switched over on the planned day and checked from every area.

Day-one support

We are available when staff arrive to resolve what turns up.

Planning ahead

A Realistic Office Move Timeline

Start IT planning as early as the lease is signed. Internet service, cabling and equipment orders have lead times that you cannot shorten once the move date is set.

If you already use our network management service, we apply the same standards to the new space, so your office keeps working the way it did before.

Items to settle early

  • Internet circuit order
  • Cabling and wall jacks
  • Phone system plan
  • Equipment delivery dates
  • Move-day schedule

How it works

How We Handle an Office Move

The work follows the lease and the calendar.

1

Survey

We review the new space, the current setup and your move date.

2

Design and order

We design the network and help order services and equipment.

3

Install and test

Equipment is installed and tested before staff arrive.

4

Move and support

We reconnect devices and stay available after the move.

Getting started

How an Office Move Is Scoped

Move and buildout projects are quoted after a survey. Hardware, cabling and carrier services are billed separately, and a location fee applies per office under managed plans.

Plan your project

We will review your situation, ask about your timeline and outline the next steps.

Who we help

Offices That Plan IT for a Move

Moves are most common when a lease ends or a team grows. We provide this work for these types of businesses:

Law Firms  |  CPA Firms  |  Medical Practices  |  Real Estate Companies  |  Property Management

Related services

Services That Work With an Office Move

These services work together with this one.

Network Management

Ongoing care for your network and Wi-Fi.

IT Strategy and Planning

Plan technology around growth.

Vendor and Software Support

Keep carriers and vendors coordinated.

FAQ

Office Move Questions

How early should we involve IT in an office move?

As early as the lease is signed. Internet service and cabling can take weeks, and ordering late is the most common cause of move-day problems.

Do you handle cabling?

We coordinate with a cabling contractor and review the work. Cabling is quoted separately.

Can you move our phones and printers?

Yes. We reconnect and test them as part of the move.

Will we have internet on the first day?

That depends on the carrier schedule. We help order early and plan for a smooth switch.

Do you help set up a brand new office?

Yes. We design the network and set up equipment for new and remodeled spaces.

How is the work priced?

It is quoted after a survey, with hardware and cabling billed separately.

Plan the IT Side of Your Move Before the Date Is Set

Start with a free IT assessment. We will review your new space and outline a timeline.