IT Services and Projects
Office Moves and Network Buildouts in Ventura County
An office move succeeds when staff arrive on Monday and everything works: internet, Wi-Fi, printers, phones and shared files. Urban IT plans the technology side of a move or new office build so those pieces are ready before the boxes arrive.
Our Westlake Village team coordinates with your landlord, internet provider, cabling contractor and phone vendor so you have one point of contact for IT.
Where we work
Based in Westlake Village
Thousand Oaks | Westlake Village | Calabasas | Woodland Hills | Los Angeles | Beverly Hills
What we cover
The short answer
What Does IT Involve in an Office Move?
IT for an office move covers everything that connects staff to their work: the internet circuit, the firewall and switches, Wi-Fi, cabling, phones, printers and computers. It also includes the timing, because internet service often takes weeks to schedule and should be ordered early.
A network buildout is the same work for a new or remodeled space. Urban IT designs the network, coordinates the vendors and sets up and tests the equipment. Hardware, cabling and carrier services are quoted separately from our labor.
Who it is for
Offices moving, expanding or opening a new location
What it costs
Projects are quoted, and hardware and cabling are quoted separately.
Where we work
On site across Ventura County and Los Angeles
How to start
A free IT assessment, ideally well before your move date
What goes wrong
Where Office Moves Run Into Trouble
Most problems trace back to late planning.
Internet ordered too late
The carrier cannot install before move day, and staff work without a connection.
Weak Wi-Fi in the new space
Coverage was never planned, so some rooms have poor signal.
Phones and printers forgotten
They are packed with the furniture and nobody remembers how they were set up.
Downtime on the first day
Equipment arrives untested, and troubleshooting begins with clients waiting.
What is included
What Our Office Move and Buildout Work Includes
The scope is set for your office.
Planning and timeline
We list what must be ready, order dates and who is responsible for each item.
Network design
We lay out the firewall, switches and Wi-Fi coverage for the new floor plan.
Vendor coordination
We work with your carrier, cabling contractor and phone provider.
Workstation and printer setup
Computers, printers and other devices are moved, reconnected and tested.
Phone and internet cutover
Service is switched over on the planned day and checked from every area.
Day-one support
We are available when staff arrive to resolve what turns up.
Planning ahead
A Realistic Office Move Timeline
Start IT planning as early as the lease is signed. Internet service, cabling and equipment orders have lead times that you cannot shorten once the move date is set.
If you already use our network management service, we apply the same standards to the new space, so your office keeps working the way it did before.
Items to settle early
How it works
How We Handle an Office Move
The work follows the lease and the calendar.
1
Survey
We review the new space, the current setup and your move date.
2
Design and order
We design the network and help order services and equipment.
3
Install and test
Equipment is installed and tested before staff arrive.
4
Move and support
We reconnect devices and stay available after the move.
Getting started
How an Office Move Is Scoped
Move and buildout projects are quoted after a survey. Hardware, cabling and carrier services are billed separately, and a location fee applies per office under managed plans.
Plan your project
We will review your situation, ask about your timeline and outline the next steps.
Who we help
Offices That Plan IT for a Move
Moves are most common when a lease ends or a team grows. We provide this work for these types of businesses:
Law Firms | CPA Firms | Medical Practices | Real Estate Companies | Property Management
Related services
Services That Work With an Office Move
These services work together with this one.
Network Management
Ongoing care for your network and Wi-Fi.
IT Strategy and Planning
Plan technology around growth.
Vendor and Software Support
Keep carriers and vendors coordinated.
FAQ
Office Move Questions
How early should we involve IT in an office move?
As early as the lease is signed. Internet service and cabling can take weeks, and ordering late is the most common cause of move-day problems.
Do you handle cabling?
We coordinate with a cabling contractor and review the work. Cabling is quoted separately.
Can you move our phones and printers?
Yes. We reconnect and test them as part of the move.
Will we have internet on the first day?
That depends on the carrier schedule. We help order early and plan for a smooth switch.
Do you help set up a brand new office?
Yes. We design the network and set up equipment for new and remodeled spaces.
How is the work priced?
It is quoted after a survey, with hardware and cabling billed separately.
Plan the IT Side of Your Move Before the Date Is Set
Start with a free IT assessment. We will review your new space and outline a timeline.